WH
Insight · the owner's view

Owner's Numbers

The week on one screen — are we on time, where's the capacity, and which work actually makes money.

On-time dispatch
83%
▲ from 71% in June
Jobs out this week
4
dispatched + installed
Scrap rate
0.3%
mostly wrong-rev & porosity
Avg utilisation
52%
across 11 work centres
Avg margin
34%
across product types
On-time deliverylast 8 weeks
71
Jun 9
74
Jun 16
78
Jun 23
80
Jun 30
79
Jul 7
82
Jul 14
85
Jul 21
83
Jul 28
Up 12 points since we started clocking every job — you can see what's actually late, so you fix it.
Throughputjobs dispatched / week
3
Jun 9
4
Jun 16
2
Jun 23
5
Jun 30
3
Jul 7
4
Jul 14
3
Jul 21
4
Jul 28
Steady 3–5 jobs a week out the door — with the bottleneck (kitting) fixed, this is where it climbs.
Machine utilisationlive load
Fibre Laser
98%
Press Brake
82%
Fit-up Bay
70%
Tube Laser
61%
Programming / Nest
55%
Finishing
50%
Plasma
44%
Weld Bay 2
40%
Inspection
30%
Weld Bay 1
24%
Dispatch / Install
20%
The laser's the constraint at 98%; the weld cell's starved at 24% — that's a kitting problem, not a people problem.
Margin by product typecompleted & near-done jobs
Balustrade
41%
Guards
41%
Frame
36%
Walkway
32%
Brackets
28%
Gates
26%
Guards & handrail runs carry the margin; the repeat bracket batch and one-off gates drag it — now you know to re-quote them.